Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Mostafa Zaree; Reza Kamranrad; Mojtaba Zaree; Iman Emami

Volume 7, Issue 2 , August 2020, , Pages 36-55

https://doi.org/10.22116/jiems.2020.221672.1342

Abstract
  Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According ...  Read More