A flow shop scheduling model considering no-wait constraints between sequential tasks
Volume 13, Issue 1, July 2026, Pages 86-96
https://doi.org/10.22116/jiems.2026.555292.1620
Fatemeh Zahmatkesh, Maryam Daneshmand-Mehr, Milad Abolghasemian
Abstract Flow shop scheduling has traditionally focused on minimizing completion time; however, growing energy costs and sustainability concerns necessitate the simultaneous consideration of energy consumption as an optimization objective. In addition, in many real-world manufacturing systems, such as chemical, food, and continuous production industries, jobs must be processed without waiting between successive operations, a constraint that significantly increases problem complexity. Despite its practical relevance, the combined consideration of no-wait flow shop scheduling and energy-aware optimization has received limited attention in the literature. This study develops a bi-objective no-wait flow shop scheduling model that simultaneously minimizes makespan and total energy consumption, accounting for both active and idle energy usage of machines. A mathematical formulation is proposed, and due to the NP-hard nature of the problem, the NSGA II metaheuristic algorithm is employed to obtain high-quality Pareto-optimal solutions. Model validity is verified using small-scale instances solved optimally, followed by large-scale computational experiments. Furthermore, a comprehensive parametric sensitivity analysis is conducted to examine the influence of key factors, including processing time, number of tasks, and machine energy consumption in active and idle states, on both objectives. The results reveal that idle energy consumption has a disproportionately high impact on total energy usage and completion time, underscoring its critical role in sustainable scheduling decisions. The findings provide both theoretical insights and practical guidelines for designing energy-efficient schedules in no-wait production environments.
Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices
Volume 5, Issue 2, December 2018, Pages 97-112
https://doi.org/10.22116/jiems.2018.80687
Amir Ebrahimzadeh Pilerood, Mehdi Heydari, Mohammad Mahdavi Mazdeh
Abstract In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional idle time is permitted. A mixed integer linear programming is formulated to determine the timing of jobs in order to minimize total energy costs while idle time insertion is allowed. For the non-delay version of the problem, a branch-and-bound algorithm is presented. A lower bound and several dominance properties are used to increase the speed of the branch-and-bound algorithm. Computational experiments are also given to evaluate the performance of the algorithm. Based on results, the proposed algorithms can optimally schedule jobs in small size samples but by increasing the number of jobs from 15 and cost periods from 3, the performance of branch-and-bound has been decreased.
