A two-objective Mathematical Model for Job Scheduling on Parallel Machines and Solving by Particle Swarm Optimization

Articles in Press, Accepted Manuscript, Available Online from 01 July 2025

https://doi.org/10.22116/jiems.2025.498885.1587

Shahram Saeidi

Abstract Time is one of the most valuable assets in industry, and cost is another highly regarded factor. Optimal utilization of these resources can increase efficiency and profit. The parallel machine scheduling problem is a fundamental issue in industry and services. This research proposes a two-objective mathematical model for parallel machine scheduling. The first objective function is defined as the makespan, which is the completion time of the last job. The second objective function is defined as the maximum cost incurred by any single machine, which is a function of the sum of the processing costs of each operation and the fixed cost of purchasing and maintaining the machines. Each job consists of multiple operations, and all operations must be completed to finish the job. Additionally, it is assumed that jobs have priorities, and precedence constraints between operations must be satisfied. Due to the model's non-linearity and the problem's complexity, a metaheuristic algorithm based on the particle swarm optimization (PSO) approach is developed to solve the proposed model by aggregating the objective functions. The proposed method is simulated in MATLAB on three sample instances in small, medium, and large scales. The computational results demonstrate the robustness and efficiency of the proposed method.

A Meta-Model based-Simulation Optimization approach for controlling rework delay duration in construction: An Intelligent Metamodeling Approach

Articles in Press, Accepted Manuscript, Available Online from 25 October 2026

https://doi.org/10.22116/jiems.2026.588428.1639

Mohammadreza Davoodabadi Farahani, Alireza Habibi, Hossein Amoozad Khalili, Mohammad Ehsanifar

Abstract Background and Objective: Rework is one of the main contributors to cost overruns, delays, and reduced productivity in construction projects. Since this phenomenon has a nonlinear and stochastic nature, conventional analytical methods do not provide sufficient capability for modeling and controlling it. The objective of this study is to propose an integrated metamodel-based simulation–optimization framework to control the duration of rework-induced delays in construction projects.
Research Method: This study employs a hybrid approach combining mathematical modeling, discrete-event simulation, design of experiments (DOE), central composite design (CCD), regression-based metamodeling, and heuristic optimization. The Modified NBI method is also used to address the multi-objective optimization problem. The research data were collected from a five-story building project in Tehran as well as 55 construction projects in the Middle East during 2015–2020. The results indicate that factors such as rework frequency and duration, workforce experience, conflicts among project stakeholders, payment delays, and political conditions are among the most influential contributors to rework. Moreover, the proposed metamodel transforms the simulation objective function from a black-box representation into a more explicit and solvable form, thereby reducing the computational burden of the optimization process.The findings suggest that integrating simulation, metamodeling, and optimization can provide an effective approach for controlling and reducing rework-related delays in construction projects. This framework improves decision-making accuracy while enabling the identification of optimal and Pareto solutions at a lower computational cost.

Optimal Urban Hospital Location Using F-ANP, F-WASPAS Methods, and Spatial Analysis: A Case Study of Arak City

Articles in Press, Accepted Manuscript, Available Online from 14 November 2026

https://doi.org/10.22116/jiems.2026.593466.1643

Mahya Saghari, Nima Hamta, Abbas Biglar

Abstract Selecting optimal locations for health and medical facilities is critical for minimizing financial burdens and improving public health outcomes. Hospital siting directly influences accessibility, service efficiency, and overall community well being. This study develops an integrated, uncertainty aware framework to identify suitable hospital locations in Arak City, Iran. The approach combines Geographic Information Systems (GIS) with advanced fuzzy multi criteria decision making techniques, including the Fuzzy Analytic Network Process (F ANP) and the Fuzzy Weighted Aggregated Sum Product Assessment (F WASPAS). Site selection criteria were defined through a comprehensive literature review, national regulatory guidelines, expert input, and local geographic considerations. F ANP was used to derive interdependent criteria weights, while GIS employed multiple fuzzy operators to generate spatial suitability maps. Subsequently, F WASPAS ranked five candidate sites based on their aggregated fuzzy scores. The results identify the most feasible and accessible areas for new hospital development and demonstrate the value of integrating fuzzy logic with spatial analysis in data scarce environments. The proposed framework offers a robust decision support tool for urban planners and health policymakers. Future research may incorporate alternative fuzzy numbers, additional criteria, and broader regional applications to further validate and extend the model.