<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Iran Center for Management Studies</PublisherName>
				<JournalTitle>Journal of Industrial Engineering and Management Studies</JournalTitle>
				<Issn>2476-308X</Issn>
				<Volume>13</Volume>
				<Issue>1</Issue>
				<PubDate PubStatus="epublish">
					<Year>2026</Year>
					<Month>07</Month>
					<Day>01</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Integrated Simulation and Multi-Objective Optimization for Enhanced Efficiency and Cost Reduction in Open-Pit Mining Haulage Operations</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage>63</FirstPage>
			<LastPage>73</LastPage>
			<ELocationID EIdType="pii">247226</ELocationID>
			
<ELocationID EIdType="doi">10.22116/jiems.2026.546013.1615</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>Abolfazl</FirstName>
					<LastName>Ghaderi</LastName>
<Affiliation>Department of Business Management, Faculty of Management and Accounting, Allameh Tabataba&amp;#039;i University, Tehran, Iran</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2025</Year>
					<Month>09</Month>
					<Day>08</Day>
				</PubDate>
			</History>
		    <Abstract>The relentless pursuit of efficiency in open-pit mining, driven by escalating operational costs and stringent environmental mandates, places the optimization of haulage systems at the forefront of mining research. This study addresses the complex dispatching challenge within the shovel-truck system at the Sarcheshmeh open-pit copper mine (Kerman Province, Iran) to simultaneously maximize monthly throughput and minimize transportation costs. We introduce a robust simulation-optimization framework where a Discrete-Event Simulation (DES) model, developed in Arena, is tightly coupled with two leading evolutionary multi-objective optimization algorithms: the Non-dominated Sorting Genetic Algorithm II (NSGA-II) and the Fast Pareto Genetic Algorithm (FastPGA). This integration facilitates the exploration of the high-dimensional, non-convex Pareto front to identify a set of near-optimal fleet compositions (number of shovels and trucks). Experimental validations demonstrate significant operational improvements: the derived optimal solutions lead to a quantifiable reduction of up to 10% in average monthly transportation costs and an increase of up to 11% in average monthly material throughput. These findings offer critical managerial insights, establishing a data-driven blueprint for mining operators to adopt advanced meta-heuristic optimization techniques to enhance operational sustainability and economic performance in dynamic pit environments.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Simulation</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Multi-Objective Optimization</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">NSGA-II</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">FastPGA</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Pareto optimality</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://jiems.icms.ac.ir/article_247226_cec4dc4834acfc7f0a2932cf7424ece4.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
