Abolghasemian, M., Kanafi, A. G., & Daneshmand-Mehr, M. (2022). Simulation‐Based Multiobjective Optimization of Open‐Pit Mine Haulage System: A Modified‐NBI Method and Meta Modeling Approach. Complexity, 2022(1), 3540736. https://doi.org/10.1155/2022/3540736
Abolghasemian, M., Daneshmand-Mehr, M., & Hassannayebi, E. (2026). Analytical based simulation modeling for short-term and long-term planning in open pit mining. Sharif Journal of Industrial Engineering & Management.
Abolghasemian, M., Kanai, A. G., & Daneshmandmehr, M. (2020). A two-phase simulation-based optimization of hauling system in open-pit mine. Iranian journal of management studies, 13(4), 705-732. https://doi.org/10.22059/ijms.2020.294809.673898
Abolghasemian, M., Nasiri Janagha, M. R., Vaseei, M., Pourghader Chobar, A., & Modibbo, U. M. (2024). A Monte Carlo simulation to identify the effect of delays in construction project scheduling. ijaor, 12(2), 1-23. http://dx.doi.org/10.71885/ijorlu-2024-1-665
Abolghasemian, M., Pourghader Chobar, A., AliBakhshi, M., Fakhr, A., & Moradi Pirbalouti, S. (2021). Delay scheduling based on discrete-event simulation for construction projects. Iranian Journal of Operations Research, 12(1), 49-63. http://iors.ir/journal/browse.php?a_id=721&sid=1&slc_lang=en
Abolghasmian, M., Eskandari, H. R., & Darabi, H. (2018). Simulation based optimization of haulage system of an open-pit mine: Meta modeling approach. Organizational resources management researchs, 8(2), 1-17. https://dor.isc.ac/dor/20.1001.1.22286977.1397.8.2.2.6
Al-Attabi, A. M. A. N. (2025). Toward delay mitigation in Iraqi construction projects: Evaluating the causes and the implications. Ain Shams Engineering Journal, 16(10), 103598. https://doi.org/10.1016/j.asej.2025.103598
Al-Bataineh, M., AbouRizk, S., & Parkis, H. (2013). Using simulation to plan tunnel construction. Journal of Construction Engineering and Management, 139(5), 564-571. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000626
Alshihri, S., Al-Gahtani, K., & Almohsen, A. (2022). Risk factors that lead to time and cost overruns of building projects in Saudi Arabia. Buildings, 12(7), 902. https://doi.org/10.3390/buildings12070902
Amaran, S., Sahinidis, N., Sharda, B., & Bury, S. J. (2015). Simulation optimization: a review of algorithm and applications. Annals of operations research, 240, 351, 380. https://doi.org/10.1007/s10479-015-2019-x
Anil, A., & Danielraj, R. C. (2016). Analyze the causes and minimize the occurrence of rework in construction project. International Journal of Innovative Research In Science, Engineering & Technology, 5(4), 6464-6467.
Alipour, N., Dabiri, N., & Abolghasemian, M. (2026, May). A Decision Model for the Development of Competitive LARG Supply Chain Management. In Operations Research Forum (Vol. 7, No. 2, p. 54). Cham: Springer International Publishing. https://doi.org/10.1007/s43069-026-00641-2
Cho, M., Park, M., Park, J., Park, S. K., Cha, G., & Park, S. (2026). From prediction to prioritization: Automated framework for delay risk management in highway earthwork projects. Automation in Construction, 181, 106588. https://doi.org/10.1016/j.autcon.2025.106588
Dengiz, B. (2009). Redesign of PCB Production Line with Simulation and Taguchi Design. Proceedings of the Winter Simulation Conference, 2197 – 2204.
Dengiz, B., İç, Y. T., & Belgin, O. (2016). A meta-model based simulation optimization using hybrid simulation-analytical modeling to increase the productivity in automotive industry. Mathematics and computers in simulation, 120, 120-128. https://doi.org/10.1016/j.matcom.2015.07.005
Hemmati, A., Kaveh, F., Abolghasemian, M., & Pourghader chobar, A. (2024). Simulating the line balance to provide an improvement plan for optimal production and costing in petrochemical industries. Journal of Engineering Management and Soft Computing, 10(1), 190-212. https://doi.org/10.22091/jemsc.2024.11189.1198
Huang, S., Liang, C., & Liu, J. (2024). Research on Neural Network Prediction Model of Whole Process Risk Management Based on Building Information Model. Advances in Civil Engineering, 2024(1), 5453113. https://doi.org/10.1155/2024/5453113
Hunter, S. R., & Pasupathy, R. (2013). Optimal sampling laws for stochastically constrained simulation optimization on finite sets. Informs Journal on computing, 25(3), 527-542. https://doi.org/10.1287/ijoc.1120.0519
Jahangiri, S., Abolghasemian, M., Ghasemi, P., & Chobar, A. P. (2023). Simulation-based optimisation: analysis of the emergency department resources under COVID-19 conditions. International journal of industrial and systems engineering, 43(1), 1-19. https://doi.org/10.1504/IJISE.2023.128399
Khajvandsany, T., Amoozadkhalili, H., Rezaeyan, R., & Nemati, K. (2025). Optimization of multi-objective simulation of excavator-truck loading system for mining minerals. Journal of Engineering Management and Soft Computing, 10(2), 182-203. https://doi.org/10.22091/jemsc.2025.11807.1229
Khan, A. M., Alaloul, W. S., Musarat, M. A., & Fayyaz, A. M. (2025). Optimizing sustainable alternatives in value engineering Decision-Making through BIM-Integrated plugin automation for buildings. Ain Shams Engineering Journal, 16(6), 103373. https://doi.org/10.1016/j.asej.2025.103373
Kleijnen, J. P. (2013). Simulation-Optimization via Kriging and Bootstrapping: A Survey Revision of CentER DP 2011-064.
Kleijnen, J. P., Beers, W. v., & Nieuwenhuyse, I. v. (2010). Constrained optimization in expensive simulation: Novel approach. European journal of operational research, 202(1), 164-174.
Love, P. E., Matthews, J., & Fang, W. (2021). Reflections on the Risk and Uncertainty of Rework in Construction. Journal of Construction Engineering and Management, 147(4), 06021001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002030
Precious, D. (2025). Infrastructure Project Cost Overrun and Schedule Delay in Ghana: Is It an Issue of Resource Misallocation or Financial Constraints?. Project Leadership and Society, 100188. https://doi.org/10.1016/j.plas.2025.100188
Sadeghi Sabzevary, A., Amoozad Khalili, H., Amirkhan, M., & Hosseini, S. M. H. (2026). A Novel Hybrid Algorithm for Designing a Sustainable Supply Chain of CAR-T Therapy in a Multi-Objective Mode Considering Disease Relapse. Journal of Engineering Management and Soft Computing, 12(1), 179-204. https://doi.org/10.22091/jemsc.2026.12874.1275
Tsai, S. C., Chen, S. T. (2017). A simulation-based multi-objective optimization framework: Acase study on invertory management. Omega, 70(2), 148-159.
Yalçınkaya, Ö., & Bayhan, G. M. (2009). Modelling and optimization of average travel time for a metro line by simulation and response surface methodology. European journal of operational research, 196(1), 225-233. http://doi.org/10.1016/j.ejor.2008.03.010
Yap, J. B. H., Goay, P. L., Woon, Y. B., & Skitmore, M. (2024). Revisiting critical delay factors for construction: Analysing projects in Malaysia. Alexandria Engineering Journal, 60(1), 1717-1729. https://doi.org/10.1016/j.aej.2020.11.021
Paape, N., van Eekelen, J. A., & Reniers, M. A. (2026). Simulation-based optimization of a production system topology-a neural network-assisted genetic algorithm. International Journal of Computer Integrated Manufacturing, 39(1), 29-52. https://doi.org/10.1080/0951192X.2025.2455631
Nikoukar, S., & Tavakolan, M. (2026). A simulation-based approach to optimizing resource allocation and logistics in construction projects: a case study. Engineering, Construction and Architectural Management, 33(4), 2916-2947. https://doi.org/10.1108/ECAM-05-2024-0629