Aghezzaf, E. H., & Van Landeghem, H. (2002). An integrated model for inventory and production planning in a two-stage hybrid production system. International journal of production research, 40(17), 4323-4339.
Agnetis, A., Aloulou, M. A., & Kovalyov, M. Y. (2017). Integrated production scheduling and batch delivery with fixed departure times and inventory holding costs. International Journal of Production Research, 55(20), 6193-6206.
Ahmadizar, F., & Farhadi, S. (2015). Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs. Computers & Operations Research, 53, 194-205.
Alba, E., & Dorronsoro, B. (2004, April). Solving the vehicle routing problem by using cellular genetic algorithms. In European Conference on Evolutionary Computation in Combinatorial Optimization (pp. 11-20). Springer, Berlin, Heidelberg.
Ayough A., Khorshidvand B., (2019), “Designing a Manufacturing Cell System by Assigning Workforce”. Journal of Industrial Engineering and Management. Vol. 12, No. 1, pp. 13-26.
Fu, Y., Tian, G., Fathollahi-Fard, A. M., Ahmadi, A., & Zhang, C. (2019). Stochastic multi-objective modelling and optimization of an energy-conscious distributed permutation flow shop scheduling problem with the total tardiness constraint. Journal of cleaner production, 226, 515-525.
Gupta, J. N. (1988). Two-stage, hybrid flowshop scheduling problem. Journal of the operational Research Society, 39(4), 359-364.
Hao, J. H., Li, J. Q., Du, Y., Song, M. X., Duan, P., & Zhang, Y. Y. (2019). Solving distributed hybrid flowshop scheduling problems by a hybrid brain storm optimization algorithm. Ieee Access, 7, 66879-66894.
Izadi, L., Ahmadizar, F., & Arkat, J. (2018). A hybrid imperialist competitive algorithm for integrated scheduling of production and distribution with vehicle routing. Journal of Industrial Engineering Research in Production Systems, 6(12), 63-81.
Izadi, L., Ahmadizar, F., & Arkat, J. (2020). A Hybrid Genetic Algorithm for Integrated Production and Distribution Scheduling Problem with Outsourcing Allowed. International Journal of Engineering, 33(11), 2285-2298.
Karimi, N., & Davoudpour, H. (2015). A branch and bound method for solving multi-factory supply chain scheduling with batch delivery. Expert Systems with Applications, 42(1), 238-245.
Karimi, N., & Davoudpour, H. (2017). Integrated production and delivery scheduling for multi-factory supply chain with stage-dependent inventory holding cost. Computational and Applied Mathematics, 36(4), 1529-1544.
Kaweegitbundit, P. (2012). Evaluation dispatching rules for two-stage hybrid flow shop scheduling with parallel machines. In Applied Mechanics and Materials (Vol. 152, pp. 1487-1491). Trans Tech Publications Ltd.
Meinecke, C., & Scholz-Reiter, B. (2014). A heuristic for the integrated production and distribution scheduling problem. Int. Sci. Index, 8(2), 290-297.
Moazami R., Ahmadizar F., farughi H., (2021), “Integrated hybrid flow shop scheduling and vehicle routing problem”, Journal of Industrial and Systems Engineering, Vol. 13, No. 2, pp. 223-244.
Mohammadi, S., Al-e-Hashem, S. M., & Rekik, Y. (2020). An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company. International Journal of Production Economics, 219, 347-359.
Moons, S., Ramaekers, K., Caris, A., & Arda, Y. (2017). Integrating production scheduling and vehicle routing decisions at the operational decision level: a review and discussion. Computers & Industrial Engineering, 104, 224-245.
Mousavi, M., Hajiaghaei–Keshteli, M., & Tavakkoli–Moghaddam, R. (2020). Two calibrated meta-heuristics to solve an integrated scheduling problem of production and air transportation with the interval due date. Soft Computing, 24(21), 16383-16411.
Oğuz, C., Zinder, Y., Janiak, A., & Lichtenstein, M. (2004). Hybrid flow-shop scheduling problems with multiprocessor task systems. European Journal of Operational Research, 152(1), 115-131.
Pan, Q. K., Tasgetiren, M. F., & Liang, Y. C. (2008). A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem. Computers & Operations Research, 35(9), 2807-2839.
Pan, Q. K., Wang, L., Mao, K., Zhao, J. H., & Zhang, M. (2012). An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process. IEEE Transactions on Automation Science and Engineering, 10(2), 307-322.
Prins, C. (2004). A simple and effective evolutionary algorithm for the vehicle routing problem. Computers & operations research, 31(12), 1985-2002.
Ramezanian, R., Mohammadi, S., & Cheraghalikhani, A. (2017). Toward an integrated modeling approach for production and delivery operations in flow shop system: trade-off between direct and routing delivery methods. Journal of Manufacturing Systems, 44, 79-92.
Rohmer S., Billaut J.CH., (2015), “Production and outbound distribution scheduling: a two-agent approach”. Presented at the 6th IESM Conference, (2015), Seville, Spain.
Scholz-Reiter, B., Makuschewitz, T., Novaes, A. G. N., Frazzon, E. M., & Lima Junior, O. F., (2011), “An approach for the sustainable integration of production and transportation scheduling”. International Journal of Logistics Systems and Management, Vol. 10, No. 2, pp. 158-179. doi:10.1504/IJLSM.2011.042626.
Shabtay, D. (2010). Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs. International Journal of Production Economics, 123(1), 235-242.
Taghizadehalvandi, M., & Kamisli Ozturk, Z. (2019). Multi-objective solution approaches for employee shift scheduling problems in service sectors (research note). International Journal of Engineering, 32(9), 1312-1319.
Ullrich, C. A. (2013). Integrated machine scheduling and vehicle routing with time windows. European Journal of Operational Research, 227(1), 152-165.
Wang, D. Y., Grunder, O., & Moudni, A. E. (2015). Integrated scheduling of production and distribution operations: a review. International Journal of Industrial and Systems Engineering, 19(1), 94-122.