A Guide to the Project Management Body of Knowledge (PMBOK® Guide). (2013). United States: Project Management Institute, Incorporated.
Anjamrooz, T., El-Sayegh, S. M., & Romdhane, L. (2024). Key Portfolio Selection Criteria for Sustainable Construction. Buildings, 14(6), 1777.
Arjrodi, A.R., M. Najafi, M. Montazeri, (2009). Prioritization of road construction projects in the country, 5th National Congress on Civil Engineering.
Asgaryan, A., E. Rezaee, M., Hashemi (2017). Authors Integrating genetic algorithm and heuristic methods to solve the project selection and scheduling problem, :
10th International Conference of Iranian Operations Research Society.
Aghajani-Delavar, N., Tavakkoli-Moghaddam, R., & Mehdizadeh, E. (2015). Design of a new mathematical model for integrated dynamic cellular manufacturing systems and production planning. International Journal of Engineering, 28(5), 746-754.
https://doi.org/10.5829/idosi.ije.2015.28.05b.13
Banadkouki, M. R. Z. (2023). Selection of strategies to improve energy efficiency in industry: A hybrid approach using entropy weight method and fuzzy TOPSIS. Energy, 279, 128070.
Banadkouki, M. Z., & Lotfi, M. M. (2021). Selection of computer-integrated manufacturing technologies using a combined fuzzy analytic hierarchy process and fuzzy TOPSIS. International Journal of Industrial Engineering & Production Research 2021;32(1):105-20.
10.22068/ijiepr.32.1.105
Bonnafous, A., P. Jensen, (2005). Ranking transport projects by their socioeconomic value or financial internal rate of return, Transport Policy, 12(2), 131-136.
Chauhan, R., Singh, T., Tiwari, A., Patnaik, A., & Thakur, N. S. (2017). Hybrid entropy–TOPSIS approach for energy performance prioritization in a rectangular channel employing impinging air jets. Energy, 134, 360-368. https://doi.org/10.1016/j.energy.2017.06.021
Costantino F, Di Gravio G, Nonino F (2015) Project selection in project portfolio management: an artificial neural network model based on critical success factors. Int J Proj Manag 33(8):1744–1754.
Gabriel, S.A., S. Kumar, J. Ordóñez, A. Nasserian, (2006). A multiobjective optimization model for project selection with probabilistic considerations, Socio-Economic Planning Sciences, 40(4), 297-313.
Ghanbari, M., Olaikhan, A.A.J. and Skitmore, M. (2024), "Enhancing project portfolio selection for construction holding firms: a multi-objective optimization framework with risk analysis", Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-05-2023-0532
Golmohammadi, A., M. Pajoutan, (2011). Meta heuristics for dependent portfolio selection problem considering risk, Expert Systems with Applications, 38(5), 5642-5649.
Hashemizadeh, A., & Ju, Y. (2019). Project portfolio selection for construction contractors by MCDM–GIS approach. International Journal of Environmental Science and Technology, 16, 8283-8296. https://doi.org/10.1007/s13762-019-02248-z.
Hejazi, T. H., Behboodi, S., & Abbaszadeh, F. (2023). Project portfolio selection to improve safety in the construction industry under fuzzy environments. Journal of Industrial Engineering and Management Studies, 10(1), 169-180.
Jeng DJ-F, Huang K-H (2015) Strategic project portfolio selection for national research institutes. J Bus Res 68(11):2305–2311
Khalili Araqi, M. (2008). Capital Budgeting: Multiple Criteria. Economics Research, 8(28), 99-118. (in persian)
Li, P., Qian, H., Wu, J., & Chen, J. (2013). Sensitivity analysis of TOPSIS method in water quality assessment: I. Sensitivity to the parameter weights. Environmental monitoring and assessment, 185, 2453-2461. https://doi.org/10.1007/s10661-012-2723-9
McCowan, A. K., S. Mohamed, (2007). Decision Support System to Evaluate and Compare Concession Options, Journal of Construction Engineering and Management, 133(2), 114-123.
Mianabadi, H., & Afshar, A. (2012). HETEROGENEOUS FUZZY GROUP DECISION MAKING IN INTEGRATED WATER RESOURCES MANAGEMENT. Sharif Journal of Civil Engineering, Volume 2-27(4), 123-131.
Namdarzangeh, S., Vatankhah, S., & Adeli Koodi, F. (2013). Selection of the most economical project using delphi method, dynamic ranking method and ideal planning. Journal of Industrial Management, 8(25), 55-61. (in persian)
Nascimento, C.R.S.d.M.S., Almeida-Filho, A.T.d. and Perez Palha, R. (2023), "A TOPSIS-based framework for construction projects’ portfolio selection in the public sector", Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-05-2023-0534
Ock, J. (1999). Integrated decision process model (IDEPM) for the development of the build-operate-transfer (BOT) highway project proposals.
Pérez F, Gómez T, Caballero R, Liern V (2018) Project portfolio selection and planning with fuzzy constraints. Technol Forecast Soc Change 131:117–129
Relich M, Pawlewski P (2017) A fuzzy weighted average approach for selecting portfolio of new product development projects. Neurocomputing 231:19–27
Shaheen, A. A., Fayek, A. R., & AbouRizk, S. M. (2007). Fuzzy numbers in cost range estimating. Journal of Construction Engineering and Management, 133(4), 325-334.
Shahrjerdi, R., Raoufinia, M., sajadifar, S., & Khalili, A. (2015). Qualitative approach and decision- making procedures for selecting BOT and BOO projects based on the risk in the water and wastewater industry. Journal of Water and Sustainable Development, 1(3), 17-26. doi: 10.22067/jwsd.v1i3.46705. (in persian)
Singh, D., R.L.K. Tiong, (2005). A Fuzzy Decision Framework for Contractor Selection, Journal of Construction Engineering and Management, 131(1), 62-70.
Sun, C. C. (2010). A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods. Expert systems with applications, 37(12), 7745-7754. https://doi.org/10.1016/j.eswa.2010.04.066
Sen, P., & Yang, J. B. (2012). Multiple criteria decision support in engineering design. Springer Science & Business Media.
TAVAKKOLI, M. R., Mousavi, S. M., & Heydar, M. (2011). An Integrated AHP-Vikormethodology For Plant Location Selection.
Tian, B., Wang, Z., Li, C. and Fu, J. (2023), “Can relational governance improve sustainability in public-private partnership infrastructure projects? An empirical study based on structural equation modeling”, Engineering, Construction and Architectural Management, Vol. 30 No. 1, pp. 19-40, doi: 10.1108/ECAM-04-2021-0333.
Volden, G.H. and Andersen, B. (2018), “The hierarchy of public project governance frameworks: an empirical study of principles and practices in Norwegian ministries and agencies”, International Journal of Managing Projects in Business, Vol. 11 No. 1, pp. 174-197, doi: 10.1108/IJMPB-04-2017-0040.
Wang, T.C., T.-H. Chang, (2007). Application of TOPSIS in evaluating initial training aircraft under a fuzzy environment, Expert Systems with Applications, 33(4), 870-880.
Wang, Y. M., & Elhag, T. M. (2006). Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment. Expert systems with applications, 31(2), 309-319. https://doi.org/10.1016/j.eswa.2005.09.040
Wu Y, Xu C, Ke Y, Chen K, Sun X (2018) An intuitionistic fuzzy multi-criteria framework for large-scale rooftop PV project portfolio selection: case study in Zhejiang, China. Energy 143:295–309
Xiao, Z., Xia, S., Gong, K., & Li, D. (2012). The trapezoidal fuzzy soft set and its application in MCDM. Applied Mathematical Modelling, 36(12), 5844-5855.
Ye, S., R.L.K. Tiong, (2000). NPV-at-Risk Method in Infrastructure Project Investment Evaluation, Journal of Construction Engineering and Management, 126(3), 227-233.
Yoon, K., C.-L. Hwang, (1981). Multiple attribute decision making: methods and applications, SPRINGER-VERLAG BERLIN AN.
Zadeh LA. Fuzzy sets. Information and control 1965;8(3):338-53.