Alawneh, R., et al. (2024). "Development of a New Method for Assessing Project Risks in Sustainable Building Construction Projects in Developing Countries: The Case of Jordan." Buildings 14(6): 1573.
Alvand, A., et al. (2023). "Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: a case study of a construction project in Iran." International journal of construction management 23(3): 392-404.
Andrić, J. M., et al. (2019). "Identifying the critical risks in railway projects based on fuzzy and sensitivity analysis: A case study of belt and road projects." Sustainability 11(5): 1302.
Antoniou, F. (2021). "Delay risk assessment models for road projects." Systems 9(3): 70.
Bepari, M., et al. (2024). "A comparative study of project risk management with risk breakdown structure (RBS): a case of commercial construction in India." International journal of construction management 24(6): 673-682.
Dandage, R. V., et al. (2018). "Analysis of interactions among barriers in project risk management." Journal of Industrial Engineering International 14: 153-169.
Erlita, A., et al. (2023). "Multiphase Project Risk Management on Food Factory Building Construction: Consultant Perspective." Journal of Construction in Developing Countries 28(1): 1-17.
Fauzi, S. N. M., et al. (2022). "A Review Paper on Risk Management of Start-up Business for Small Medium Entrepreneurs (SMEs)." The Journal of Management Theory and Practice.
Festel, G., et al. (2013). "Valuation of early stage high-tech start-up companies." International journal of business 18(3): 216.
Giardino, C., et al. (2014). "What do we know about software development in startups?" IEEE software 31(5): 28-32.
Gichohi, P. P., et al. (2024). "PROJECT RISK MANAGEMENT ON THE PERFORMANCE OF ROAD CONSTRUCTION PROJECTS IN KENYA." International Journal of Management and Business Research 6(1): 108-130.
Harrison, R. T. and C. M. Mason (2017). "Backing the horse or the jockey? Due diligence, agency costs, information and the evaluation of risk by business angel investors." International Review of Entrepreneurship 15(3): 269-290.
He, S., et al. (2024). "Systemic Risk Analysis of Safety, Progress, and Investment in the Construction of a Water Transfer Project and the Importance of Common Cause Failure." Water 16(10): 1454.
Karaarslan, M. H. and N. Soylu (2023). "Risk Factors in Start-Ups: An Evaluation." Selçuk Üniversitesi Sosyal Bilimler Meslek Yüksekokulu Dergisi 26(1): 241-258.
Khalilzadeh, M., et al. (2024). "A Step-By-Step Hybrid Approach Based on Multi-Criteria Decision-Making Methods And A Bi-Objective Optimization Model To Project Risk Management." Decision Making: Applications in Management and Engineering 7(1): 442-472.
Marle, F. (2020). "An assistance to project risk management based on complex systems theory and agile project management." Complexity 2020(1): 3739129.
Nge’tich, E. and R. Munene (2024). "Influence of project risk management practices on road projects in Nakuru County, Kenya." International Academic Journal of Human Resource and Business Administration 4(4): 163-197.
Nikolaenko, V. and A. Sidorov (2023). "Analysis of 105 IT project risks." Journal of Risk and Financial Management 16(1): 33.
Nunes, M. and A. Abreu (2020). "Managing open innovation project risks based on a social network analysis perspective." Sustainability 12(8): 3132.
Nunes, M., et al. (2021). "A model to manage cooperative project risks to create knowledge and drive sustainable business." Sustainability 13(11): 5798.
Polishchuk, V., et al. (2019). "A fuzzy model of risk assessment for environmental start-up projects in the air transport sector." International journal of environmental research and public health 16(19): 3573.
Qian, Q. and P. Lin (2016). "Safety risk management of underground engineering in China: Progress, challenges and strategies." Journal of Rock Mechanics and Geotechnical Engineering 8(4): 423-442.
Senova, A., et al. (2023). "New approaches to project risk assessment utilizing the Monte Carlo method." Sustainability 15(2): 1006.
Teberga, P. M. F., et al. (2018). "Risk analysis in introduction of new technologies by start-ups in the Brazilian market." Management Decision 56(1): 64-86.
Sarvenaz Heydarpour, Seyyed Hosein Seyyed Esfahani Behrooz Khorshidvand, Providing a DEA and AHP hybrid model to evaluate contractors’ performance
((Case study: Zarand Iranian Steel Co. (ZISCO), ournal of Industrial Engineering and Management Studies, Vol. 9, No. 1, 2022, Pages 1-10
Mahmoud Rasouli, Ashkan Ayough, Behrooz Khorshidvand, Akbar Alemtabriz, Evaluating risk factors in solar energy investments: A strategic approach for Iran’s market, Solar Energy Volume 262, 15 September 2023, 111884
Ashkan Ayough, Setareh Boshruei, Behrooz Khorshidvand, A new interactive method based on multi-criteria preference degree functions for solar power plant site selection, Renewable Energy Volume 195, August 2022, Pages 1165-117