Assessing start-up project risks with statistical techniques: a multi-objective approach using SWARA and fuzzy WASPAS

Document Type : Original Article

Authors

1 Department of Industrial Engineering, Energy Institute of Higher Education, Tehran, Iran.

2 School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran.

Abstract
Start-up projects are increasingly gaining attention from investors and entrepreneurs due to changing paradigms, making their evaluation essential. But problem is that start-ups like any other firms have some risks that they are not familiar with. On the other hand, there is less research in literature which explore and assess start up project risks that can be considered as a gap. This research addresses a gap in the literature by comprehensively identifying, evaluating, and managing risks associated with start-up projects. Utilizing FMEA, fuzzy MCDM, and a mathematical model, the study aims to rank the risks of start-up projects and determine optimal strategies to mitigate them. Fuzzy MCDM technique in weighting part was Swara that was used for determination of measures weight and in ranking part was WASPAS that was used for ranking alternatives. The projects examined include Snapp, Tapsi, DigiKala, Aparat, CafeBazzar, and Alopeyk in Iran. The results reveal that time is the most significant risk factor, with a value of 0.53, followed by cost at 0.30 and quality at 0.17. Furthermore, the most critical risks identified include resource shortages and supply challenges, closely followed by team size, time pressures, and the business plan, with uncertainty ranking prominently as well. The final analysis provides optimal strategies focused on minimizing time and cost, emphasizing their optimization in risk response. This research can help managers to decide about project based on their risks and also start up business population can get information about probable risks of their project before and after running them.

Keywords


Alawneh, R., et al. (2024). "Development of a New Method for Assessing Project Risks in Sustainable Building Construction Projects in Developing Countries: The Case of Jordan." Buildings 14(6): 1573.
Alvand, A., et al. (2023). "Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: a case study of a construction project in Iran." International journal of construction management 23(3): 392-404.
Andrić, J. M., et al. (2019). "Identifying the critical risks in railway projects based on fuzzy and sensitivity analysis: A case study of belt and road projects." Sustainability 11(5): 1302.
Antoniou, F. (2021). "Delay risk assessment models for road projects." Systems 9(3): 70.
Bepari, M., et al. (2024). "A comparative study of project risk management with risk breakdown structure (RBS): a case of commercial construction in India." International journal of construction management 24(6): 673-682.
Dandage, R. V., et al. (2018). "Analysis of interactions among barriers in project risk management." Journal of Industrial Engineering International 14: 153-169.
Erlita, A., et al. (2023). "Multiphase Project Risk Management on Food Factory Building Construction: Consultant Perspective." Journal of Construction in Developing Countries 28(1): 1-17.
Fauzi, S. N. M., et al. (2022). "A Review Paper on Risk Management of Start-up Business for Small Medium Entrepreneurs (SMEs)." The Journal of Management Theory and Practice.
Festel, G., et al. (2013). "Valuation of early stage high-tech start-up companies." International journal of business 18(3): 216.
Giardino, C., et al. (2014). "What do we know about software development in startups?" IEEE software 31(5): 28-32.
Gichohi, P. P., et al. (2024). "PROJECT RISK MANAGEMENT ON THE PERFORMANCE OF ROAD CONSTRUCTION PROJECTS IN KENYA." International Journal of Management and Business Research 6(1): 108-130.
Harrison, R. T. and C. M. Mason (2017). "Backing the horse or the jockey? Due diligence, agency costs, information and the evaluation of risk by business angel investors." International Review of Entrepreneurship 15(3): 269-290.
He, S., et al. (2024). "Systemic Risk Analysis of Safety, Progress, and Investment in the Construction of a Water Transfer Project and the Importance of Common Cause Failure." Water 16(10): 1454.
Karaarslan, M. H. and N. Soylu (2023). "Risk Factors in Start-Ups: An Evaluation." Selçuk Üniversitesi Sosyal Bilimler Meslek Yüksekokulu Dergisi 26(1): 241-258.
Khalilzadeh, M., et al. (2024). "A Step-By-Step Hybrid Approach Based on Multi-Criteria Decision-Making Methods And A Bi-Objective Optimization Model To Project Risk Management." Decision Making: Applications in Management and Engineering 7(1): 442-472.
Marle, F. (2020). "An assistance to project risk management based on complex systems theory and agile project management." Complexity 2020(1): 3739129.
Nge’tich, E. and R. Munene (2024). "Influence of project risk management practices on road projects in Nakuru County, Kenya." International Academic Journal of Human Resource and Business Administration 4(4): 163-197.
Nikolaenko, V. and A. Sidorov (2023). "Analysis of 105 IT project risks." Journal of Risk and Financial Management 16(1): 33.
Nunes, M. and A. Abreu (2020). "Managing open innovation project risks based on a social network analysis perspective." Sustainability 12(8): 3132.
Nunes, M., et al. (2021). "A model to manage cooperative project risks to create knowledge and drive sustainable business." Sustainability 13(11): 5798.
Polishchuk, V., et al. (2019). "A fuzzy model of risk assessment for environmental start-up projects in the air transport sector." International journal of environmental research and public health 16(19): 3573.
Qian, Q. and P. Lin (2016). "Safety risk management of underground engineering in China: Progress, challenges and strategies." Journal of Rock Mechanics and Geotechnical Engineering 8(4): 423-442.
Senova, A., et al. (2023). "New approaches to project risk assessment utilizing the Monte Carlo method." Sustainability 15(2): 1006.
Teberga, P. M. F., et al. (2018). "Risk analysis in introduction of new technologies by start-ups in the Brazilian market." Management Decision 56(1): 64-86.
 Sarvenaz Heydarpour, Seyyed Hosein Seyyed Esfahani Behrooz Khorshidvand, Providing a DEA and AHP hybrid model to evaluate contractors’ performance
((Case study: Zarand Iranian Steel Co. (ZISCO), ournal of Industrial Engineering and Management Studies, Vol. 9, No. 1, 2022, Pages 1-10
Mahmoud Rasouli, Ashkan Ayough, Behrooz Khorshidvand, Akbar Alemtabriz, Evaluating risk factors in solar energy investments: A strategic approach for Iran’s market, Solar Energy  Volume 262, 15 September 2023, 111884
Ashkan Ayough, Setareh Boshruei, Behrooz Khorshidvand, A new interactive method based on multi-criteria preference degree functions for solar power plant site selection, Renewable Energy Volume 195, August 2022, Pages 1165-117